Asda Distribution Centre, Warrington

  • Market Sector: Commercial
  • Principal Contractor: McLaren Construction
  • Trade Contractor: Severfield (Design & Build) Ltd
  • Construction: New Build

We were contracted to erect this two storey distribution centre for Asda Northwest comprising 2260 tonnes of hot and cold rolled steel for the low bay and a further 480 tonnes for the high bay. The main frame was built over a 16 week period and the mezzanine floor which took 10 weeks was erected concurrently to synchronize completion within a 20 week period.